Mesh Tunnel ExcavationsSize: 5m Property Mid SoilĢ. Import Property from GTS NX Steel Structure with soil and tunnel finalģ. Use imprint command on building footing for mesh connection with raft.ġ. Export structure from MIDAS Gen (MXT text file).2. Results > Solid Stresses > Plastic Statusġ. Shows Critical State of Tunnel Walls (Yield Stresses)Ģ. Results > Displacement > Total Translation Analysis Control > Activate options as shownġ. Static / Slope Analysis > Boundary > ConstraintĪctivate all except excavations3. Mesh 4th Soil LayerSize: 10m Property: Soft Rockġ. Mesh 3rd Soil LayerSize: 10m Property: Bot SoilĤ. Mesh 2nd Soil LayerSize: 10m Property: Mid Soilģ. Mesh Top Soil LayerSize: 10m Property: Top SoilĢ. Inspect MaterialsTunnel Concrete Max Yield Stress 7500kN/m^2 Geometry > Surface & Solid > Auto Connect2. Import Topographic DXF file and combine with bore hole strata informationġ. Integrated Solver Optimized for the next generation 64-bit platformįinite Element Solutions for Geotechnical Engineering
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |